The servicelife performance of concrete bridge decks, including maintenance, repair, and rehabilitation needs, is directly related to the care exercised from the preconstruction through postconstruction period. Graduate theses and dissertations iowa state university capstones, theses and dissertations 2014 methods for removing concrete decks from steel girder bridges. Ala saadeghvaziri and rambod hadidi cause and control of transverse cracking in concrete bridge decks department of civil and environmental engineering new jersey institute of technology. A bridge floor is the entire length of the bridge from the roadway side of the mudwall or pile cap to the other roadway side of the mudwall or pile cap and the entire width from one coping edge across to the other coping edge. Patching procedure using bridge floor slab patching concrete 7. Cause and control of transverse cracking in concrete. Economical, rustic and natural, wood is specified on at least half the bridges excel builds. State of the practice southeast bridge preservation partnership april 14, 2011 raleigh, nc presented by michael c. Concrete bridge detail concrete bridge detail dwg file, concrete bridge detail download. The report addresses the partial removal of concrete from decks and other parts of bridge structures. This is a bridge deck patching concrete with a micro silica overlay. Sealants and waterproofing technical drawing balcony at patio door dxf. Bridge rehabilitation or repairbridge rehabilitation or repair. Each bridge standard details sheet has been prepared by a technical owner, who is a registered civil engineer in the state of california.
Ultrahigh performance concrete composite connections for. Our concrete accessories product categories include. Technical drawing typical installation details technical drawing typical layout for slab and slab edge repair. Portland cement concrete overlays were used on both bridges. Furthermore, effective january 1, 2001 the dot issued new mixture requirements for portland cement concrete patching. The primary use of this section is to address unanticipated localized bridge deck damage that typically must be. This work shall consist of hotmix asphalt surface removal, when required, the removal and disposal of all loose and deteriorated concrete from bridge deck and the replacement with new concrete to the original top of deck. This section covers bridge deck repairs over relatively small areas. This aasho h20 bridge is located on state route 208. These cad drawings are available to purchase and download immediately.
Preparation of the transition from the concrete deck to the curb horizontal to vertical transitions needs to be a chamfer material may need to be applied to give solid backing to the detail strip. The main preventive maintenance objective for concrete bridge decks is to. It is intended as a practical guide for state highway agency and contractor personnel who face the challenge of using new and appropriate technologies for concrete removal and bar. The primary use of this section is to address unanticipated localized bridge deck damage that typically must be repaired quickly.
Epoxy injection method is used for cracks as narrow as 0. Full depth rigid pavement slab repair detail section 88. How to repair concrete slab core holes with the adm core hole. Several sources of cracking for concrete bridge deck overlays have been identified 2, 3, 7. Concrete bridge decks do not need expansion joints wood. Aci 345r11 guide for concrete highway bridge deck construction author. To increase the durability of reinforced concrete bridges, all concrete movement and construction joints, plus the bridge decks have to be waterproofed to prevent serious damage to the concrete, or to the embedded steel reinforcement. Masteremaco t 545 quickset concrete roadway patching mortar. Due to dynamic loading, the bridge decks must be protected with elastic, crackbridging systems to accommodate any movement and maintain the protection. There are three imperatives for repairing cracked bridge decks. This page contains a listing of all the approved bridge detail bd sheets that have been issued.
The minimum amount of reinforcement in each direction shall be 0. M400ar is specially designed for hot weather bridge deck applications and where heavy equipment will be driven on the. Methods for removing concrete decks from steel girder bridges. Founded in 1904 and headquartered in farmington hills, michigan, usa, the american concrete institute is a leading authority and resource worldwide for the development, dissemination, and adoption of its consensusbased standards, technical resources, educational programs, and proven expertise for individuals and organizations involved in concrete design. It is a biobased, nonhazardous, extremelylow voc product primarily used as a component of an expansion joint assembly either to fill blockouts on each side of an expansion joint gap, to repair a damaged expansion joint gap edge, as an impact. Bridge deck overlays 91220 1 bridge deck overlay projects 101 presentation by central office bridge rehabilitation group a protective wearing surface placed on a usually existing bridge deck to prolong the service life and to provide a smooth riding surface what is a bridge deck overlay.
First, determine if the cracks are structural or nonstructural. Because it is light weight and can be installed with hand tools after the bridge is set, it is often the material of choice for bridges that might be moved, or are to be put in sites with. The bond breaker allows the patch and the old concrete to move independently. Structural design guidelines for concrete bridge decks. The deck is vulnerable to the effects of mechanical wear and weather. A dot type grade concrete roadway repair and anchoring material, with a minimum initial set time of.
Damage in the top of the deck only not progressing full depth is. Wall forming accessories ties, coil products, brackets. The shear connector devices can be rolled in embossments, lugs, holes or wires welded to the panels. The next part of the sheet number is a two letter id which is used to group sheets with a similiar theme ex. Route 208 colorado river bridge at robert lee description. Repairs are sometimes known as patch repair when the area to be treated is small and skin repair when, for example, the whole side of a member is to be broken out and reinstated. M400ar is specially designed for hot weather bridge deck applications and where heavy equipment will be driven on the deck immediately after membrane installation. This backing can be a cement and sand mortar mix, such as meadow patch 20 repair mortar from w. Curb or curb and gutter adjacent to roadway andor sidewalk across bridge standards,roadway sections 611985. Largescale deck repair or replacement work should typically include projectspecific plans and be in accordance with item 422, concrete superstructures. Concrete deck slab details the following detailing practice is intended to minimize the bridge deck cracking in both transverse and longitudinal directions. Partialdepth bridge deck repairs are typically performed on fulldepth castin place bridge decks. How to repair concrete slab core holes with the adm core. Waterproofing for bridge decks to increase the durability of reinforced concrete bridges, all concrete movement and construction joints, plus the bridge decks have to be waterproofed to prevent serious damage to the concrete, or to the embedded steel reinforcement.
The work shall be done according to the applicable. Many times bridge decks have more cracks than is practical, from a cost and downtime perspective, to be repaired by crack injection. Wisconsin department of transportation bridge manual. Specification requirements 1 specify on the plans if cement type other than type i or type ii will be used. Closeup of cleaned concrete deck and trapped dust and debris in the cracks before being blown out clean with air. Consequently, decks may require more maintenance and repair than other bridge components. As mentioned in chapter 1, the focus of nchrp 1071 was to develop specifications, guidelines, and examples for the design and construction of durable castinplace cip reinforced concrete connections for precast deck systems that emulate monolithic construction, considering issues including speed of construction, durability, and fatigue. Castinplace concrete connections for precast deck systems. One problem with the use of this type of modular decking system is the composite connection that ties the deck panels to the supporting girders.
Concrete bridge deck, deterioration, patching materials, corrosion, durability. Reinstatement with concrete or mortar can take several different forms depending on the size of the area being repaired and the means of applying the. Concrete bridge decks and deck overlays may develop cracks whenever the tensile stresses induced by either internal or external sources exceed the tensile strength of the concrete. The deck profile configuration can also be used to interlock concrete and steel. Proper patch detail excavate around bars especially when chlorides are present. Hma shall follow section 408 of the standard specifications. Concrete bridge detail concrete bridge detail dwg file,concrete bridge detail download. Ac 15053806b september 28, 2007 appendix c figure c 9. Outline of rapid treatments for bridge deck protection, repair, and.
Aci 345r11 guide for concrete highway bridge deck construction. Standard sheets are available both in the us customary units accessible below and in metric units. The technique generally consists of establishing entry and venting ports at close intervals along the cracks, sealing the crack on exposed surfaces, and injecting the. We are dedicated to be the best cad resource for architects,interior designer and landscape designers. The details are considered to be project plans for contract administration purposes in accordance with section 51. January 25, 2019 purpose this manual includes stepbystep repair procedures for use on new and existing concrete members cast. Deck slab repair illinois department of transportation. It crosses the colorado river at robert lee, coke county, texas. The unrestrained shrinkage of a concrete mixture with the vdot minimum paste requirements is approximately 1in100ft.
These are often referred to as alligator cracks or spider webs. The deck may be cracked through the entire depth of the concrete slab or cracked only in the unbonded concrete overlay. M400ar is a 70 mil, internally reinforced sheet waterproofing membrane with a built in white reflective topping. Cause and control of transverse cracking in concrete bridge decks. A hurdle to structural design with crr is that accurate, accessible methods for predicting. Li, in advanced composites in bridge construction and repair, 2014. The standard sheet books are also available as compiled. The overlays were bonded to the old deck concrete by portland cement grout.
Bd sheets are intended to show how the typical parts that make up a bridge are to be detailed. The bridge deck is the roadway portion of a bridge, including shoulders. In bridgedeck overlay repairs, premature reflective cracking is often the ultimate failure mode that limits repair service life. Concrete, deck, cracking, cracks, transverse, bridges, causes of cracking, control of cracking unclassified unclassified 204 fhwanj2002019 m. The following will describe the recommended procedure to use when installing meldek bridge deck membrane from w. Reinstatement with concrete or mortar can take several different forms depending on the size of the area being repaired and the means of. Deck patching involves sounding and marking areas of concrete. Repairing bridge deck cracks epoxy bonding is an economical solution. This concrete repair and anchoring material uses a chemical action for quick curing. Pedestrian bridge deck types excel bridge manufacturing. Concrete repair technical drawing concrete repair patch edge treatment dxf technical drawing concrete repair patch edge treatment. Placing concrete place concrete into the repair area from readymix truck or other mobile batch vehicles.
Concrete bridge decks resist wear and weather well, provide good traction and ride quality, and in many designs provide a part of the structural strength of the bridge. Jan, 2014 the adm core hole repair kit available online at. Masteremaco t545 formerly called set 45 is a quicksetting onecomponent magnesium phosphatebased patching and repair mortar. The need for deck patching is almost always caused by corrosion of the reinforcement. Distribute the concrete evenly to avoid the need of excessive shoveling. As a result, there is an interest in using precast concrete deck elements to accelerate onsite construction activities while simultaneously increasing the quality of the bridge deck concrete.
69 882 1483 674 3 1375 363 663 774 1489 481 167 881 930 845 58 279 639 364 1446 1445 576 698 306 555 965 1062 782 1420 659 714 493 1183